[1] 张蒙正,邹宇.美国典型高超飞行器项目研发及启示[J].火箭推进,2012,38(2):1-8.ZHANG M Z,ZOU Y.Development of American typical hyper-sonic flight vehicles and its enlightenment[J].Journal of Rocket Propulsion,2012,38(2):1-8(in Chinese).
[2] NASA Systems Engineering Handbook.NASA center for aerospace information:NASA/SP-2007-6105[R].Washington,D.C.:NASA,2007:15-35.
[3] GRINFFIN M D.System engineering and the "Two cultures" of engineering(Boeing lecture presented at Purdue University)[R].Lafayette:Purdue University,2007:1-3.
[4] 徐志磊.以科学为基础的复杂系统工程研制[J].中国工程科学,2002,4(10):1-12.XU Z L.Science-based engineering R & D of complex systems[J].Engineering Science,2002,4(10):1-12(in Chinese).
[5] GRAVES R E.An analytics-based methodology for assessing aerospace system uncertainty to augment risk-informed systems engineering processes:AIAA-2013-0723[R].Reston:AIAA,2013.
[6] 余后满,林益明,陈虎,等.航天器系统方案设计模式研究[J].航天器工程,2010,19(3):1-6.YU H M,LIN Y M,CHEN H,et al.Improved mode for spacecraft system scheme design[J].Spacecraft Engineering,2010,19(3):1-6(in Chinese).
[7] SOLISH B,COOKE B,COX N,et al.Verification & validation by risk class:Understanding how risk classes affect the V & V process:AIAA-2013-5527[R].Reston:AIAA,2013.
[8] LUM C W,WAGGONER B.A risk based paradigm and model for unmanned aerial systems in the national airspace:AIAA-2011-1424[R].Reston:AIAA,2011.
[9] PATRIC S,SHAWN G,TIM G.Probabilistic risk analysis methodology on inadvertent laser illumination of satellite optical systems[J].Journal of Spacecraft and Rockets,2014,51(6):1994-2007.
[10] GAMBLE K B,LIGHTSEY E G.Decision analysis applied to small satellite risk management:AIAA-2015-1863[R].Reston:AIAA,2015.
[11] JIMENEZ H,SCHUTTE J,MAVRIS D.System readiness and risk assessment for advanced vehicle concepts-discussion of fundamental concepts:AIAA-2011-0423[R].Reston:AIAA,2011.
[12] 沈小明,张彤,揭裕文.航空产品研制阶段的技术性能风险研究[J].南京航空航天大学学报(社会科学版),2014,16(1):64-71.SHEN X M,ZHANG T,JIE Y W.Research on technical performance risk during aero-product development[J].Journal of Nanjing University of Aeronautics & Astronautics(Social Sciences),2014,16(1):64-71(in Chinese).
[13] 徐哲,冯允成,鲁大伟.武器装备研制项目的技术风险评估[J].系统工程与电子技术,2005,27(6):1123-1127.XU Z,FENG Y C,LU D W.Appraisement model of technical risk for weapon system development[J].Systems Engineering and Electronics,2005,27(6):1123-1127(in Chinese).
[14] SIEVERS M,MADNI A M.Defining "Credible Faults," a risk-based approach:AIAA-2015-4528[R].Reston:AIAA,2015.
[15] ENRIGHT M P,LIANG W W.Development of risk contours for assessment of aircraft engine components:AIAA-2010-2846[R].Reston:AIAA,2010.
[16] BOUDALI H,SáNCHEZ A H.A conceptual design phase risk assessment methodology for space-based system of systems:AIAA-2010-8738[R].Reston:AIAA,2010.
[17] HAMLIN T L,THIGPEN E,KAHN J,et al.Shuttle risk progression:Use of the shuttle probabilistic risk assessment(PRA) to show reliability growth:AIAA-2011-7353[R].Reston:AIAA,2011.
[18] 赵净净.民用飞机研发过程中的权衡研究[J].科技创新导报,2011(34):5-14.ZHAO J J.Trade study of civil aircraft development [J].Science and Technology Innovation Herald,2011(34):5-14(in Chinese).
[19] HANSON J M,BEARD B B.Applying monte carlo simulation to launch vehicle design and requirements verification[J].Journal of Spacecraft and Rockets,2012,49:136-144.
[20] 盛骤,谢式千,潘承毅.概率论与数理统计[M].北京:高等教育出版社,2001:25-145.SHENG Z,XIE S Q,PAN C Y.Probability theory and mathematical statistics[M].Beijing:Higher Education Press,2001:25-145(in Chinese). |