[1] SAINT R. Lessons learned in developing an international planning software system[C]//Proceedings of the 7th International Conference on Space Operations, 2002: 1-10.
[2] CHIEN S A, KNIGHT R, STECHERT A, et al. Using iterative repair to improve the responsiveness of planning and scheduling[C]//Proceedings of the 5th International Conference on Artificial Intelligence Planning and Scheduling, 2000: 300-307.
[3] KNIGHT S, RABIDEAU G, CHIEN S, et al. Space exploration through continuous planning[J]. IEEE Intelligent Systems, 2001, 16(5): 70-75.
[4] ZOESCHINGER G A, WICKLER M, KOEHLER A, et al. A planning system for payload and system planning of the Columbus module on ISS[C]//Proceedings of the 8th International Conference on Space Operations, 2004: 1-6.
[5] 罗亚中, 林鲲鹏, 唐国金. 空间站运营任务规划技术评述[J]. 载人航天, 2012, 18(2): 7-13. LUO Y Z, LIN K P, TANG G J. Review on space station mission planning technology[J]. Manned Spaceflight, 2012, 18(2): 7-13 (in Chinese).
[6] 田坤黉, 侯永青. 国际空间站运营管理体系架构分析[J]. 载人航天, 2011, 17(1): 10-15. TIAN K H, HOU Y Q. Analysis of international space station operation architecture[J]. Manned Spaceflight, 2011, 17(1): 10-15 (in Chinese).
[7] LIN K P, LUO Y Z, TANG G J. Optimization of logistics strategies for long-duration space station operation[J]. Journal of Spacecraft and Rockets, 2014, 51(5): 1709-1720.
[8] 李志海, 侯永青, 严厚民, 等. 空间站长期运营任务规划建模初步研究[J]. 载人航天, 2013, 19(5): 52-58. LI Z H, HOU Y Q, YAN H M, et al. Preliminary modeling study on long-term operation mission planning of space station[J]. Manned Spaceflight, 2013, 19(5): 52-58 (in Chinese).
[9] BU H J, ZHANG J, LIN K P, et al. Short-term planning of the space station operation mission based on genetic algorithm[C]//Proceedings of 64th International Astronautical Congress, 2013: 1-9.
[10] BU H J, ZHANG J, LUO Y Z. Space station short-term mission planning using ontology modelling and time iteration[J]. Journal of Systems Engineering and Electronics, 2016, 27(2): 407-421.
[11] VERFAILLIE G, PRALET C, LEMAITRE M. Constraint-based modeling of discrete event dynamic systems[J]. Journal of Intelligent Manufacturing, 2010, 21(1): 31-47.
[12] 习婷, 李菊芳. 面向动态需求的成像卫星滚动式重调度方法研究[J]. 中国管理科学, 2015, 23(专辑): 269-274. XI T, LI J F. The rolling horizon method for EOS scheduling with dynamic request[J]. Chinese Journal of Management Science, 2015, 23(Special Issue): 269-274 (in Chinese).
[13] 王建江, 朱晓敏, 吴朝波, 等. 面向应急条件的多星动态调度方法[J]. 航空学报, 2013, 34(5): 1151-1164. WANG J J, ZHU X M, WU C B, et al. Multi-satellite dynamic scheduling method for emergencies[J]. Acta Aeronautica et Astronautica Sinica, 2013, 34(5): 1151-1164 (in Chinese).
[14] 贺川, 邱涤珊, 许光, 等. 面向对地成像观测任务的高空飞艇应急调度[J]. 航空学报, 2012, 33(11): 2082-2092. HE C, QIU D S, XU G, et al. Emergency scheduling of earth-observing imaging tasks on high-altitude airships[J]. Acta Aeronautica et Astronautica Sinica, 2012, 33(11): 2082-2092 (in Chinese).
[15] 赵凡宇, 徐瑞, 崔平远. 启发式深空探测器任务规划方法[J]. 宇航学报, 2015, 36(5): 496-503. ZHAO F Y, XU R, CUI P Y. Heuristic mission planning approach for deep space explorer[J]. Journal of Astronautics, 2015, 36(5): 496-503 (in Chinese).
[16] 傅阳光, 周成平, 王长青, 等. 考虑时间约束的无人飞行器航迹规划[J]. 宇航学报, 2011, 32(4): 749-755. FU Y G, ZHOU C P, WANG C Q, et al. Path planning for UAV considering time constraint[J]. Journal of Astronautics, 2011, 32(4): 749-755 (in Chinese).
[17] 王晓晖, 李爽. 深空探测器约束简化与任务规划方法研究[J]. 宇航学报, 2016, 37(7): 768-774. WANG X H, LI S. Research on constraint simplification and mission planning method for deep space explorer[J]. Journal of Astronautics, 2016, 37(7): 768-774 (in Chinese). |