[1] 贺川,邱涤珊,朱晓敏,等. 基于滚动优化策略的成像侦察卫星应急调度方法[J]. 系统工程理论与实践, 2013, 33(10):2685-2694. HE C, QIU D S, ZHU X M, et al. Emergency sheduling method for imaging reconnaissance satellites based on rolling horizon optimization strategy[J]. System Engineering Theory and Practice, 2013, 33(10):2685-2694(in Chinese). [2] 陈书剑, 李智, 胡敏, 等. 应急任务响应时间最优的多星成像规划方法[J]. 中国空间科学技术, 2020, 40(2):17-28. CHEN S J,LI Z,HU M, et al. Multi-satellite imaging scheduling method with optimal response time for emergency tasks[J]. Chinese Space Science and Technology, 2020, 40(2):17-28(in Chinese). [3] MORRIS R A, DUNGAN J L, BRESINA J L. An information infrastructure for coordinating earth science observations[C]//IEEE International Conference on Space Mission Challenges for Information Technology. Piscataway:IEEE Press, 2006. [4] YAO F, LI J F, BAI B C. Earth observation satellites scheduling based on decomposition optimization algorithm[J]. International Journal of Image, Graphics & Signal Processing, 2010, 2(1):9. [5] 孙凯,邢立宁,陈英武. 基于分解优化策略的多敏捷卫星联合对地观测调度[J]. 计算机集成制造系统, 2013, 19(1):127-136. SUN K, XING L N, CHEN Y W. Agile earth observing satellites mission scheduling based on decomposition optimization algorithm[J]. Computer Integrated Manufacturing Systems, 2013, 19(1):127-136(in Chinese). [6] 白保存,陈英武,贺仁杰,等.基于分解优化的多星合成观测调度算法[J].自动化学报, 2009, 35(5):596-604. BAI B C, CHEN Y W, HE R J, et al. Scheduling satellites observation and task merging based on decom position optimization algorithm[J]. Acta Automatica Sinica, 2009, 35(5):596-604(in Chinese). [7] 朱政霖, 马广彬, 黄鹏, 等. 基于任务分解的多星成像规划模型建立与求解[J]. 航天器工程, 2018, 27(2):6-13. ZHU Z L, MA G B, HUANG P, et al. Establishment and solution of multi-satellite imaging scheduling model based on task decomposition[J]. Spacecraft Engineering, 2018, 27(2):6-13(in Chinese). [8] LI J,LI J,JING N,et al. A satellite schedulability prediction algorithm for EO SPS[J]. Chinese Journal of Aeronautics, 2013, 26(3):705-716. [9] 白国庆,陈英武,杨振宇,等. 基于集成BP神经网络的成像卫星任务可调度性预测方法[C]//第二届高分辨率对地观测学术年会, 2013:1-9. BAI G Q, CHEN Y W, YANG Z Y, et al. An integrated BP neural network based imaging satellite mission schedulability prediction method[C]//The Second Annual Academic Conference on High-resolution Earth Observation, 2013:1-9(in Chinese). [10] 刘嵩,白国庆,陈英武. 地球观测网络成像任务可调度性预测方法[J]. 宇航学报, 2015, 36(5):583-588. LIU S, BAI G Q, CHEN Y W. Prediction method for imaging task schedulability of earth observation network[J]. Journal of Astronautics, 2015, 36(5):583-588(in Chinese). [11] 邢立宁, 王原, 何永明, 等. 基于BP神经网络的星上任务可调度性预测方法[J]. 中国管理科学, 2015, 23(S1):117-124. XING L N, WANG Y, HE Y M, et al. An earth observation satellite task schedulability prediction method based on BP artificial network[J]. Chinese Journal of Management Science, 2015,23(S1):117-124(in Chinese). [12] PENG S, CHEN H, DU C, et al. Onboard observation task scheduling for an autonomous earth observation satellite using long short-term memory[J]. IEEE Access, 2018, 99(6):65118-65129. [13] SUTSKEVER I, VINYALS O, LE Q V. Sequence to sequence learning with neural networks[C]//Advances in Neural Information Processing Systems, 2014:3104-3112. [14] GEHRING J, AULI M, GRANGIER D, et al. Convolutional sequence to sequence learning[DB/OL]. arXiv preprint:1705.03122,2017. [15] VASWANI A, SHAZEER N, PARMAR N, et al. Attention is all you need[C]//Advances in Neural Information Processing Systems, 2017:5998-6008. [16] DEVLIN J, CHANG M W, LEE K, et al. BERT:Pre-training of deep bidirectional transformers for language understanding[C]//Proceedings of the 2019 Conference of the North American Chapter of the Association for Computational Linguistics:Human Language Technologies, 2019:4171-4186. [17] 郭玉华, 李军, 赵珂, 等. 多星联合任务规划的迭代修复求解技术[J]. 系统工程与电子技术, 2009, 31(8):1958-1962. GUO Y H, LI J, ZHAO K, et al. Iterative repair method for multiple satellites united imaging scheduling[J]. Systems Engineering and Electronics, 2009, 31(8):1958-1962(in Chinese). [18] 郭玉华, 李军, 赵珂, 等. 多星联合任务规划中的启发式求解方法研究[J]. 宇航学报, 2009, 30(2):652-658. GUO Y H, LI J, ZHAO K, et al. A heuristic method for earth observing satellites united imaging scheduling[J]. Journal of Astronautics, 2009, 30(2):652-658(in Chinese). [19] 黄生俊, 邢立宁, 郭波. 基于改进模拟退火的多星任务规划方法[J]. 科学技术与工程, 2012, 31(12):8293-8298. HUANG S J, XING L N, GUO B. Multi-satellites mission scheduling technique based on improved simulated annealing[J]. Science Technology and Engineering, 2012, 31(12):8293-8298(in Chinese). [20] CHEN Q W, ZHAO H, LI W, et al. Behavior sequence transformer for E-commerce recommendation in Alibaba[DB/OL]. arXiv preprint:1905.06874. [21] SHANG S, LIU J, YANG Y. Multi-layer transformer aggregation encoder for answer generation[J]. IEEE Access, 2020, 8:90410-90419. [22] 张小莲, 李群, 殷明慧, 等. 一种引入停止机制的改进爬山算法[J]. 中国电机工程学报, 2012, 32(14):128-134. ZHANG X L, LI Q, YIN M H, et al. An improved hill-climbing searching method based on halt mechanim[J]. Proceedings of The Chinese Society for Electrical, 2012, 32(14):128-134(in Chinese). [23] LIU X, LAPORTE G, CHEN Y, et al. An adaptive large neighborhood search metaheuristic for agile satellite scheduling with time-dependent transition time[J]. Computers & Operations Research, 2017, 86(10):41-53. |