[1] BACHMAN T C, KLINE R C. Model for estimating spare parts requireents for future missions:AIAA-2004-5978[R].Reston:AIAA, 2004.
[2] ROBERT C K, TOVEY C. Estimating spare parts requirements with commonality and redundancy:AIAA-2006-7233[R]. Reston:AIAA, 2006.
[3] ROBERT C K, TOVEY C. Estimating spare parts requirements with commonality and redundancy[J]. Journal of Spacecraft and Rockets, 2007, 44(4):977-984.
[4] 卫忠, 徐晓飞, 战德臣, 等. 协同供应链多级库存控制的多目标优化模型及其求解方法[J]. 自动化学报, 2007, 33(2):181-187. WEI Z, XU X F, ZHAN D C, et al. Multi objective optimization model for collaborative multi-echelon inventory control in supply chain[J]. Acta Automatica Sinica, 2007, 33(2):181-187(in Chinese).
[5] LI Y, YANG B, HU H J. A simulation-optimization approach to spare parts allocation based on decision-maker's satisfaction[C]//Proceedings of International Conference on Reliability Maintainability and Safety, 2009:576-581.
[6] IMAN N, SEYED R H. A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times[J]. Applied Mathematical Modeling, 2011, 35:1157-1166.
[7] 王乃超, 康锐. 多约束条件下备件库存优化模型及分解算法[J]. 兵工学报, 2009, 30(2):247-251. WANG N C, KANG R. An optimization model for inventory spares under multi-constraints and its decomposition algorithm[J]. Acta Armamentarii, 2009, 30(2):247-251(in Chinese).
[8] 阮旻智, 李庆民, 张光宇, 等. 多约束下舰船装备携行备件保障方案优化研究[J]. 兵工学报, 2013, 34(9):1144-1149. RUAN M Z, LI Q M, ZHANG G Y, et al. Optimization method of carrying spare parts support project for warship equipment under multi-constrants[J]. Acta Armamentarii, 2013, 34(9):1144-1149(in Chinese).
[9] RUAN M Z, LUO Y, LI H. Configuration model of partial repairable spares under batching ordering policy on inventory state[J]. Chinese Journal of Aeronautics, 2014, 27(3):558-567.
[10] FRANCESCO C, GIULIO D G, MASSIMO T. Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints[J]. Reliability Engineering and System Safety, 2013, 119:95-101.
[11] 甘茂治, 康建设, 高崎. 军用装备维修工程学[M].第2版. 北京:国防工业出版社, 2010:42-46. GAN M Z, KANG J S, GAO Q. Military equipment maintenance engineering[M].2nd ed. Beijing:National Defense Industry Press, 2010:42-46(in Chinese).
[12] 中国人民解放军总装备部. GJB4355-2002备件供应规划要求[S]. 北京:中国人民解放军总装备部, 2003:21-22. The PLA General Armament Department. GJB4355-2002 Spares provisioning requirements[S]. Beijing:The PLA General Armament Department, 2003:21-22(in Chinese).
[13] SHERBROOKE C C. VARI-METRIC:Improved approximations for multi-indenture multi-echelon availability models[J]. Operations Research, 1986,34:311-319.
[14] SHERBROOKE C C. Optimal inventory modeling of system:Multi-Echelon techniques[M]. 2nd ed. Boston:Artech House, 2004:29-31.
[15] 王慎. 装备使用阶段备件保障策略优化及仿真建模方法研究[D]. 武汉:海军工程大学, 2014:30-31. WANG S. Research on optimization and simulation modeling method for support policies of spare parts in operational phase of equipments[D]. Wuhan:Naval University of Engineering, 2014:30-31(in Chinese).
[16] 刘任洋, 李庆民, 李华. 基于横向转运策略的可修件三级库存优化模型[J]. 航空学报, 2014, 35(12):3341-3349. LIU R Y, LI Q M, LI H. Optimal model of three-echelon inventory for repairable spare parts with lateral transshipments[J]. Acta Aeronautica et Astronautica Sinica, 2014, 35(12):3341-3349(in Chinese). |