[1] Shah J, Avittathur B. The retailer multi-item inventory problem with demand cannibalization and substitution. International Journal of Production Economics, 2007, 106(1): 104-114.[2] Ruan M Z, Li Q M, Peng Y W, et al. Evaluation of equipment system availability for multi-echelon maintenance supply with cannibalization. Acta Aeronautica et Astronautica Sinica, 2012, 33(4): 658-665. (in Chinese) 阮旻智, 李庆民, 彭英武, 等. 串件拼修对策下多级维修供应的装备系统可用度评估. 航空学报, 2012, 33(4): 658-665.[3] Sherbrooke C C. Optimal inventory modeling of system: multi-echelon techniques. 2nd ed. Boston: Artech House, 2004: 112-133.[4] Sherbrooke C C. VARI-METRIC: improved approximations for multi-indenture multi-echelon availability models. Operations Research, 1986, 34(2): 311-319.[5] Miller B L. Real time METRIC for the distribution of serviceable assets. RM-5687-PR, 1968.[6] Federgruen A, Zipkin P. Approximations of dynamic multi-location production and inventory problems. Management Science, 1984, 30(1): 69-84.[7] Cai Z M, Kang R, Long J. System optimization-oriented dynamic spares configuration method. Systems Engineering and Electronics, 2011, 32(11): 2363-2366. (in Chinese) 蔡泽明, 康锐, 龙军. 面向系统优化的备件动态配置方法. 系统工程与电子技术, 2011, 32(11): 2363-2366.[8] Liu X C, Wang L, Xu Y P, et al. Research on ABMS based wartime spares support adaptation decision. Systems Engineering and Electronics, 2010, 32(12): 2595-2598. (in Chinese) 刘喜春, 王磊, 许永平, 等. 战时可修复备件供应保障优化模型. 系统工程与电子技术, 2010, 32(12): 2595-2598.[9] Buyukkurt M D, Parlar M. A comparison of allocation policies in a two-echelon repairable-item inventory model. International Journal of Production Economics, 1993, 29(3): 291-302.[10] Wang N C, Kang R, Cheng H L. Study on the dynamic characteristics of spare inventory based on Markov process. Acta Armanentarii, 2009, 30(7): 984-988.(in Chinese) 王乃超, 康锐, 程海龙. 基于马尔科夫过程的备件库存动态特性分析. 兵工学报, 2009, 30(7): 984-988.[11] Hausman W H, Scudder G D. Priority scheduling rules for repairable inventory systems. Management Science, 1982, 29(11): 1215-1232.[12] Adan I J B F, Sleptchenko A, van Houtum G J. Reducing costs of spare parts supply systems via static priorities. Asia-Pacific Journal of Operational Research, 2009, 26(4): 559-585.[13] Zhang G Y, Li Q M, Li H. Modeling of unidirectional lateral transshipments in multilocation inventory systems. Acta Aeronautica et Astronautica Sinica, 2013, 34(5): 1092-1100. (in Chinese) 张光宇, 李庆民, 李华. 零备件的多点库存单向转运模型与算法. 航空学报, 2013, 34(5): 1092-1100.[14] Pyke D F. Priority repair and dispatch policies for repairable item logistics systems. Naval Research Logistics, 1990, 37(1): 1-30.[15] Caggiano E, Muckstadt A. Integrated real-time capacity and inventory allocation for reparable service parts in a two-echelon supply system. Manufacturing & Service Operations Management, 2006, 8(3): 292-319.[16] Ge E S, Li Q M, Zhang G Y, et al. Optimization of condition-based maintenance for deteriorating system under imperfect maintenance. Acta Aeronautica et Astronautica Sinica, 2013, 34(2): 316-324. (in Chinese) 葛恩顺, 李庆民, 张光宇, 等. 考虑不完全维修的劣化系统最优视情维修策略. 航空学报, 2013, 34(2): 316-324.[17] Ge E S, Li Q M, Peng Y W, et al. Condition-based maintenance model and optimization for single-unit system with multiple competing processes. Acta Aeronautica et Astronautica Sinica, 2013, 34(3): 580-587. (in Chinese) 葛恩顺, 李庆民, 彭英武, 等. 多重故障并发下单部件系统视情维修建模与优化. 航空学报, 2013, 34(3): 580-587.[18] Isaacson E, Boren M. Dyna-metric Version 6: an advanced capability assessment model. R-4214-AF, 1993.[19] Craig C. Estimation of the variance-to-mean ratio for AFLC recoverable items. Potomac: Sherbrooke & Associates, 1984: 34-47.[20] Sherbrooke C C. Metric: a multi-echelon technique for recoverable item control. Operations Research, 1968, 16(1): 122-141. |