航空学报 > 2026, Vol. 47 Issue (11): 332664-332664   doi: 10.7527/S1000-6893.2025.32664

基于贝叶斯异常数据处理的液体火箭研制成本估算方法

徐振亮, 汪小卫, 宋征宇(), 陈蓉   

  1. 中国运载火箭技术研究院,北京 100076
  • 收稿日期:2025-08-07 修回日期:2025-09-01 接受日期:2025-10-31 出版日期:2025-11-17 发布日期:2025-11-03
  • 通讯作者: 宋征宇 E-mail:zycalt12@sina.com
  • 基金资助:
    国家自然科学基金(52232014);天地往返高效运输技术全国重点试验室

Liquid rocket development cost estimation method based on Bayesian abnormal data processing

Zhenliang XU, Xiaowei WANG, Zhengyu SONG(), Rong CHEN   

  1. China Academy of Launch Vehicle Technology,Beijing 100076,China
  • Received:2025-08-07 Revised:2025-09-01 Accepted:2025-10-31 Online:2025-11-17 Published:2025-11-03
  • Contact: Zhengyu SONG E-mail:zycalt12@sina.com
  • Supported by:
    National Natural Science Foundation of China(52232014);State Key Laboratory of High-Efficiency Reusable Aerospace Transportation Technology

摘要:

为了提高复杂装备成本估算的准确性和可靠性,提出一种基于贝叶斯后验分布异常数据处理的复杂装备成本估算灰色GM(0,N)模型。以液体火箭为研究案例,首先通过“3σ准则”剔除了可能存在的异常数据样本,提升了数据集的质量和模型的准确性。随后,利用贝叶斯估计方法计算了每单位研制成本关键参数(如起飞质量)的均值和方差,为后续的异常值检测提供了科学依据。在此基础上,构建了分数阶累加的灰色GM(0,N)模型,并通过最小二乘法确定各项未知参数,实现了对目标火箭研制成本的精确估算。实验结果表明,与多元线性回归模型和普通灰色GM(0,N)模型相比,所提方法具有更高的估算精度和更好的鲁棒性。具体而言,预测误差仅为2.637 5%,而多元线性回归模型和普通灰色GM(0,N)模型的误差分别为20.716 9%和14.212 8%。此外,该方法不仅适用于液体火箭研制成本估算,还可以推广到其他复杂工程系统的成本估算问题中,为相关领域的科学研究和技术发展提供了有益参考。

关键词: 贝叶斯后验分布, 复杂装备成本估算, 分数阶累加, 灰色GM(0,N)模型, 液体火箭研制成本估算

Abstract:

A Bayesian posterior distribution-based abnormal data processing GM (0, N) model is proposed for complex equipment cost estimation to enhance the accuracy and reliability of cost prediction for sophisticated systems. Taking rocket systems as a case study, potential abnormal data samples were first eliminated using the three-sigma criterion to improve dataset quality and model precision. Subsequently, Bayesian estimation methods were employed to calculate the mean and variance of critical development cost-per-unit parameters (e.g., takeoff mass), providing a scientific foundation for subsequent outlier detection. A fractional-order accumulation GM (0, N) model was subsequently constructed, where the unknown parameters were determined through the least squares method, enabling precise development cost estimation for target rocket configurations. Experimental results demonstrate that compared with multivariate linear regression models and conventional GM (0, N) models, the proposed method achieves superior estimation accuracy and enhanced robustness. Specifically, the prediction error of this methodology was reduced to 2.637 5%, whereas the errors of multivariate linear regression and conventional GM (0, N) models reached 20.716 9% and 14.212 8% respectively. Furthermore, this methodology not only applies to liquid rocket development cost estimation but can also be extended to cost prediction problems in other complex engineering systems, providing valuable references for scientific research and technological development in related fields.

Key words: Bayesian posterior distribution, complex equipment cost estimation, fractional-order accumulation, GM (0, N) model, liquid rocket development cost estimation

中图分类号: