首页 >

面向遥感回传的卫星层间资源调度优化方法-AI+空天科学

罗引航1,国萌2,卢少兆3,包泽宇3,李忠奎1   

  1. 1. 北京大学
    2. 北京大学工学院
    3. 中国空间技术研究院
  • 收稿日期:2026-04-08 修回日期:2026-09-24 出版日期:2026-10-08 发布日期:2026-10-08
  • 通讯作者: 李忠奎
  • 基金资助:
    不确定环境下无人飞行器集群自主安全飞行控制方法研究

An optimization method for inter-layer satellite resource scheduling for remote sensing data return

  • Received:2026-04-08 Revised:2026-09-24 Online:2026-10-08 Published:2026-10-08
  • Contact: Zhongkui Li

摘要: 针对遥感用户星经低轨中继层回传数据时层间可见窗口短而离散、建链准备时间占用有效传输区间以及任务动态到达等问题,提出事件驱动滚动束搜索方法。建立考虑层间可见窗口、建链准备时间、任务时限、任务优先级和中继接入资源约束的调度模型;在事件触发的滚动重规划中继承仍可执行的连接,并根据任务处理优先程度、当前传输收益和机会保留代价评价候选连接,沿后续事件状态进行有限前瞻。动态场景下,利用任务到达分布估计后续资源需求压力并修正候选连接评价。仿真结果表明,在任务均已知且截止时限和优先级不同的静态场景中,任务按期完成率、优先级加权任务按期完成率和高优先级任务按期完成率分别为82.22%、77.65%和73.61%;在动态任务到达场景中,引入分布信息后,任务按期完成率、高优先级任务按期完成率和平均有效回传完成比例较无预测信息时分别提高3.9、12.7和1.2个百分点。结果表明,该方法能够在有限未来信息条件下协调当前回传收益与后续可用接入机会。

关键词: 遥感回传, 层间链路, 资源调度, 可见性约束, 建链时延, 低轨中继星座

Abstract: Short, discrete inter-layer visibility windows, link setup time, and dynamic task arrivals complicate remote-sensing data return through a low-Earth-orbit (LEO) relay layer. An event-driven rolling beam search method is proposed. The scheduling model considers visibility windows, link setup time, task deadlines and priorities, and relay access constraints. At each event, executable connections are retained; candidate connections are evaluated by task priority, transmission gain, and opportunity-preservation cost, and explored over subsequent event states. For dynamic arrivals, arrival distributions estimate future resource demand and adjust candidate evaluation. When all tasks were known a priori but had different deadlines and priorities, the task, priority-weighted, and high-priority on-time completion rates were 82.22%, 77.65%, and 73.61%. Under dynamic arrivals, distribution information increased the task and high-priority on-time completion rates and the average effective data-return completion ratio by 3.9, 12.7, and 1.2 percentage points, respectively. The method balances current data-return gains against future access opportunities under limited future information.

Key words: remote sensing data return, inter-layer links, resource scheduling, visibility constraints, link establishment delay, LEO relay constellation

中图分类号: