1 |
李宗凌, 宋桂萍, 汪路元, 等. 巨型星座高效管理与智能应用关键技术研究[J]. 航天器工程, 2023, 32(1): 1-7.
|
|
LI Z L, SONG G P, WANG L Y, et al. Research on Key Technologies of High efficiency management and intelligent application for mega-constellation[J]. Spacecraft Engineering, 2023, 32(1): 1-7 (in Chinese).
|
2 |
王朝辉, 徐瑞, 李朝玉, 等. 加权负载均衡合同网大规模星座任务分配方法[J]. 航天控制, 2023, 41(4): 59-66.
|
|
WANG Z H, XU R, LI C Y, et al. Large-scale constellation task allocation method through weighted load balancing contract network[J]. Aerospace Control, 2023, 41(4): 59-66 (in Chinese).
|
3 |
张逢贵, 李舒薇, 杨学海, 等. 星地系统中的站网资源优化调度综述与展望[J]. 系统仿真技术, 2023, 19(3): 283-292.
|
|
ZHANG F G, LI S W, YANG X H, et al. Optimal scheduling of ground station network resources in satellite-ground systems: Overview and prospects[J]. System Simulation Technology, 2023, 19(3): 283-292 (in Chinese).
|
4 |
TARTAKOVSKY A G, BROWN J. Adaptive spatial-temporal filtering methods for clutter removal and target tracking[J]. IEEE Transactions on Aerospace and Electronic Systems, 2008, 44(4): 1522-1537.
|
5 |
HERNANDEZ M L, FARINA A, RISTIC B. PCRLB for tracking in cluttered environments: Measurement sequence conditioning approach[J]. IEEE Transactions on Aerospace and Electronic Systems, 2006, 42(2): 680-704.
|
6 |
WU G H, LUO Q Z, DU X, et al. Ensemble of metaheuristic and exact algorithm based on the divide-and-conquer framework for multisatellite observation scheduling[J]. IEEE Transactions on Aerospace and Electronic Systems, 2022, 58(5): 4396-4408.
|
7 |
GOOLEY T D. Automating the satellite range scheduling process[D]. Ohio: Air Force Institute of Technology, 1993:10-17.
|
8 |
GOOLEY T D, BORSI J J, MOORE J T. Automating air force satellite control network (AFSCN) scheduling[J]. Mathematical and Computer Modelling, 1996, 24(2): 91-101.
|
9 |
HU X X, ZHU W M, AN B, et al. A branch and price algorithm for EOS constellation imaging and downloading integrated scheduling problem[J]. Computers & Operations Research, 2019, 104: 74-89.
|
10 |
康宁, 武小悦. 基于拉格朗日松弛的航天测控调度上界求解算法[J]. 国防科技大学学报, 2011, 33(3): 38-43.
|
|
KANG N, WU X Y. TT & C scheduling upper bound solution algorithm based on Lagrangian relaxation[J]. Journal of National University of Defense Technology, 2011, 33(3): 38-43 (in Chinese).
|
11 |
刘建平, 李晶, 张天骄. 航天测控网调度的混合构造启发式算法[J]. 系统工程与电子技术, 2015, 37(7): 1569-1574.
|
|
LIU J P, LI J, ZHANG T J. Hybrid constructive heuristics of space measurement and control network scheduling problem[J]. Systems Engineering and Electronics, 2015, 37(7): 1569-1574 (in Chinese).
|
12 |
WU J, YAO F, SONG Y J, et al. Frequent pattern-based parallel search approach for time-dependent agile earth observation satellite scheduling[J]. Information Sciences, 2023, 636: 118924.
|
13 |
VAZQUEZ R, PEREA F, GALÁN V J. Resolution of an Antenna-Satellite assignment problem by means of Integer Linear Programming[J]. Aerospace Science and Technology, 2014, 39: 567-574.
|
14 |
邱涤珊, 张利宁, 祝江汉, 等. 多星任务规划中的FFFS-DTMB与ADTPC-DTMB算法[J]. 航空学报, 2009, 30(11): 2178-2184.
|
|
QIU D S, ZHANG L N, ZHU J H, et al. FFFS-DTMB and ADTPC-DTMB algorithmin multi-satellites mission planning[J]. Acta Aeronautica et Astronautica Sinica, 2009, 30(11): 2178-2184 (in Chinese).
|
15 |
辛立强, 张超, 赵灵芝, 等. 面向复杂关联测控需求的冲突规避调度算法[J]. 系统工程与电子技术, 2022, 44(5): 1581-1588.
|
|
XIN L Q, ZHANG C, ZHAO L Z, et al. Conflict avoidance scheduling algorithm for complex associated TT & C requirements[J]. Systems Engineering and Electronics, 2022, 44(5): 1581-1588 (in Chinese).
|
16 |
MANSOUR M A A, DESSOUKY M M. A genetic algorithm approach for solving the daily photograph selection problem of the SPOT5 satellite[J]. Computers & Industrial Engineering, 2010, 58(3): 509-520.
|
17 |
WU G H, LIU J, MA M H, et al. A two-phase scheduling method with the consideration of task clustering for earth observing satellites[J]. Computers & Operations Research, 2013, 40(7): 1884-1894.
|
18 |
ZHANG Z J, ZHANG N, FENG Z R. Multi-satellite control resource scheduling based on ant colony optimization[J]. Expert Systems with Applications, 2014, 41(6): 2816-2823.
|
19 |
SARKHEYLI A, BAGHERI A, GHORBANI-VAGHEI B, et al. Using an effective tabu search in interactive resources scheduling problem for LEO satellites missions[J]. Aerospace Science and Technology, 2013, 29(1): 287-295.
|
20 |
WU G H, WANG H L, PEDRYCZ W, et al. Satellite observation scheduling with a novel adaptive simulated annealing algorithm and a dynamic task clustering strategy[J]. Computers & Industrial Engineering, 2017, 113: 576-588.
|
21 |
宋彦杰, 王沛, 张忠山, 等. 面向多星任务规划问题的改进遗传算法[J]. 控制理论与应用, 2019, 36(9): 1391-1397.
|
|
SONG Y J, WANG P, ZHANG Z S, et al. An improved genetic algorithm for multi-satellite mission planning problem[J]. Control Theory & Applications, 2019, 36(9): 1391-1397 (in Chinese).
|
22 |
薛乃阳, 丁丹, 王红敏, 等. 基于改进遗传算法的多类测控资源调度方法[J]. 系统工程与电子技术, 2021, 43(9): 2535-2543.
|
|
XUE N Y, DING D, WANG H M, et al. Multi-type TT & C resource scheduling method based on improved genetic algorithm[J]. Systems Engineering and Electronics, 2021, 43(9): 2535-2543 (in Chinese).
|
23 |
伍国华, 王天宇. 基于自适应模拟退火的大规模星座测控资源调度算法[J]. 航空学报, 2023, 44(12): 327759.
|
|
WU G H, WANG T Y. Large-scale constellation TT & C resource scheduling algorithm based on adaptive simulated annealing[J]. Acta Aeronautica et Astronautica Sinica, 2023, 44(12): 327759 (in Chinese).
|
24 |
谢平, 杜永浩, 姚锋, 等. 敏捷成像卫星自主调度技术综述[J]. 宇航学报, 2019, 40(2): 127-138.
|
|
XIE P, DU Y H, YAO F, et al. Literature review for autonomous scheduling technology of agile earth observation satellites[J]. Journal of Astronautics, 2019, 40(2): 127-138 (in Chinese).
|
25 |
杜永浩, 邢立宁, 姚锋, 等.航天器任务调度模型、算法与通用求解技术综述[J]. 自动化学报, 2021, 47(12): 2715-2741.
|
|
DU Y H, XING L N, YAO F. Survey on models, algorithms and general techniques for spacecraft mission scheduling[J]. Acta Automatica Sinica, 2021, 47(12): 2715-2741. (in Chinese).
|
26 |
刘阳, 周笛, 盛敏, 等. 面向巨型星座系统的多地面站协同测控技术[J]. 天地一体化信息网络, 2023, 4(01): 2-11.
|
|
LIU Y, ZHOU D, SHEN M, et al. Multi-ground station collaborative measurement and control technology for giant constellation system[J]. Space-Integrated-Ground Information Networks, 2023, 4(01): 2-11 (in Chinese).
|
27 |
LEMAı̂TRE M, VERFAILLIE G, JOUHAUD F, et al. Selecting and scheduling observations of agile satellites[J]. Aerospace Science and Technology, 2002, 6(5): 367-381.
|
28 |
KODHELI O, LAGUNAS E, MATURO N, et al. Satellite communications in the new space era: A survey and future challenges[J]. IEEE Communications Surveys & Tutorials, 2021, 23(1): 70-109.
|
29 |
DEL PORTILLO I, CAMERON B G, CRAWLEY E F. A technical comparison of three low earth orbit satellite constellation systems to provide global broadband[J]. Acta Astronautica, 2019, 159: 123-135.
|
30 |
WANG L, JIANG C X, KUANG L L, et al. Mission scheduling in space network with antenna dynamic setup times[J]. IEEE Transactions on Aerospace and Electronic Systems, 2019, 55(1): 31-45.
|
31 |
贺仁杰, 高鹏, 白保存, 等. 成像卫星任务规划模型、算法及其应用[J]. 系统工程理论与实践, 2011, 31(3): 411-422.
|
|
HE R J, GAO P, BAI B C, et al. Models, algorithm and applications to the mission planning system of imaging satellites[J]. Systems Engineering Theory and Practice, 2011, 31(3): 411-422 (in Chinese).
|
32 |
丁冬, 何兵, 余炜, 等. 美国天基导弹预警系统发展及效能仿真研究[J]. 中国电子科学研究院学报, 2022, 17(11): 1102-1106.
|
|
DING D, HE B, YU W, et al. Development and effectiveness simulation of American space-based missile early warning system[J]. Journal of China Academy of Electronics and Information Technology, 2022, 17(11): 1102-1106 (in Chinese).
|
33 |
LIU B J, DENG M, WU G H, et al. Bottom-up mechanism and improved contract net protocol for dynamic task planning of heterogeneous earth observation resources[J]. IEEE Transactions on Systems, Man, and Cybernetics: Systems, 2022, 52(10): 6183-6196.
|
34 |
WOSNIACK M E, RAPOSO E P, VISWANATHAN G M, et al. A parallel algorithm for random searches[J]. Computer Physics Communications, 2015, 196: 390-397.
|
35 |
HIEN V Q, DAO T C, BINH H T T. A greedy search based evolutionary algorithm for electric vehicle routing problem[J]. Applied Intelligence, 2023, 53(3): 2908-2922.
|
36 |
李夏苗, 陈新江, 伍国华, 等. 考虑断点续传的中继卫星调度模型及启发式算法[J]. 航空学报, 2019, 40(11): 323233.
|
|
LI X M, CHEN X J, WU G H, et al. Scheduling model and heuristic algorithm for tracking and data relay satellite considering breakpoint transmission[J]. Acta Aeronautica et Astronautica Sinica, 2019, 40(11): 323233 (in Chinese).
|
37 |
李夏苗, 廖文昆, 伍国华, 等. 基于两阶段迭代优化的空天观测资源协同任务规划方法[J]. 控制与决策, 2021, 36(5): 1147-1156.
|
|
LI X M, LIAO W K, WU G H, et al. A two-stage iterative optimazation method for the coordinated task planning of space and air observation resources[J]. Control and Decision, 2021, 36(5): 1147-1156 (in Chinese).
|
38 |
靳鹏, 李康. 基于改进合同网协议的分布式卫星资源调度[J]. 系统工程与电子技术, 2022, 44(10): 3164-3173.
|
|
JIN P, LI K. Distributed satellite resource scheduling based on improved contract network protocol[J]. Systems Engineering and Electronics, 2022, 44(10): 3164-3173 (in Chinese).
|