基于改进NSGA-Ⅱ的飞机定检任务调度工期鲁棒性多目标优化
陈农田, 张玉城, 李琳琳, 郑又铭
Multi-objective optimization of robustness of aircraft scheduled maintenance task scheduling duration based on improved NSGA-
Nongtian CHEN, Yucheng ZHANG, Linlin LI, Youming ZHENG
航空学报 . 2026, (8): 232675 -232675 .  DOI: 10.7527/S1000-6893.2025.32675