针对遥感用户星经低轨中继层回传数据时层间可见窗口短而离散、建链准备时间占用有效传输区间以及任务动态到达等问题,提出事件驱动滚动束搜索方法。建立考虑层间可见窗口、建链准备时间、任务时限、任务优先级和中继接入资源约束的调度模型;在事件触发的滚动重规划中继承仍可执行的连接,并根据任务处理优先程度、当前传输收益和机会保留代价评价候选连接,沿后续事件状态进行有限前瞻。动态场景下,利用任务到达分布估计后续资源需求压力并修正候选连接评价。仿真结果表明,在任务均已知且截止时限和优先级不同的静态场景中,任务按期完成率、优先级加权任务按期完成率和高优先级任务按期完成率分别为82.22%、77.65%和73.61%;在动态任务到达场景中,引入分布信息后,任务按期完成率、高优先级任务按期完成率和平均有效回传完成比例较无预测信息时分别提高3.9、12.7和1.2个百分点。结果表明,该方法能够在有限未来信息条件下协调当前回传收益与后续可用接入机会。
Short, discrete inter-layer visibility windows, link setup time, and dynamic task arrivals complicate remote-sensing data return through a low-Earth-orbit (LEO) relay layer. An event-driven rolling beam search method is proposed. The scheduling model considers visibility windows, link setup time, task deadlines and priorities, and relay access constraints. At each event, executable connections are retained; candidate connections are evaluated by task priority, transmission gain, and opportunity-preservation cost, and explored over subsequent event states. For dynamic arrivals, arrival distributions estimate future resource demand and adjust candidate evaluation. When all tasks were known a priori but had different deadlines and priorities, the task, priority-weighted, and high-priority on-time completion rates were 82.22%, 77.65%, and 73.61%. Under dynamic arrivals, distribution information increased the task and high-priority on-time completion rates and the average effective data-return completion ratio by 3.9, 12.7, and 1.2 percentage points, respectively. The method balances current data-return gains against future access opportunities under limited future information.
[1]H?yhty? M, Anttonen A, Majanen M, et al. Multi-layered satellite communications systems for ultra-high availability and resilience[J]. Electronics, 2024, 13(7): 1269.
[2]Chougrani H, Kodheli O, Georganaki A, et al. Connecting space missions through NGSO constellations: feasibility study[J]. Frontiers in Communications and Networks, 2024, 5: 1356484.
[3]Chen J, Di X, Xu R, et al. A remote sensing data transmission strategy based on the combination of satellite-ground link and GEO relay under dynamic topology[J]. Future Generation Computer Systems, 2023, 145: 337-353.
[4]Chen H, Zhai B, Wu J, et al. A satellite observation data transmission scheduling algorithm oriented to data topics[J]. International Journal of Aerospace Engineering, 2020, 2020(1): 2180674.
[5]Zhang J, Xing L. An improved genetic algorithm for the integrated satellite imaging and data transmission scheduling problem[J]. Computers & Operations Research, 2022, 139: 105626.
[6]Chen M, Chai R, Chen Q. Joint route selection and resource allocation algorithm for data relay satellite systems based on energy efficiency optimization[C]//2019 11th International Conference on Wireless Communications and Signal Processing (WCSP). Xi'an: IEEE, 2019: 1-6.
[7]李夏苗, 陈新江, 伍国华, 贺川, 龙运军. 考虑断点续传的中继卫星调度模型及启发式算法[J]. 航空学报, 2019, 40(11): 323233-323233.
LI Xiamiao, CHEN Xinjiang, WU Guohua, HE Chuan, LONG Yunjun. Scheduling model and heuristic algorithm for tracking and data relay satellite considering breakpoint transmission[J]. ACTA AERONAUTICAET ASTRONAUTICA SINICA, 2019, 40(11): 323233-323233 (in Chinese).
[8]Chen X, Li X, Wang X, et al. Task scheduling method for data relay satellite network considering breakpoint transmission[J]. IEEE Transactions on Vehicular Technology, 2020, 70(1): 844-857.
[9]Li Z, Chen X, Luo Q, et al. Dynamic scheduling method for data relay satellite networks considering hybrid system disturbances[J]. Complex & Intelligent Systems, 2024, 10(1): 1483-1499.
[10]Deng B, Jiang C, Kuang L, et al. Two-phase task scheduling in data relay satellite systems[J]. IEEE Transactions on Vehicular Technology, 2017, 67(2): 1782-1793.
[11]Lee M, Yu S, Kwon K, et al. Mixed-integer linear programming model for scheduling missions and communications of multiple satellites[J]. Aerospace, 2024, 11(1): 83.
[12]Wang P, Zhang X, Zhang S, et al. Time-expanded graph-based resource allocation over the satellite networks[J]. IEEE Wireless Communications Letters, 2018, 8(2): 360-363.
[13]Yan J, Xing L, Li C, et al. Multicommodity flow modeling for the data transmission scheduling problem in navigation satellite systems[J]. Complex System Modeling and Simulation, 2021, 1(3): 232-241.
[14]Lin X, Chen Y, Xue J, et al. Large-volume LEO satellite imaging data networked transmission scheduling problem: Model and algorithm[J]. Expert Systems with Applications, 2024, 249: 123649.
[15]Guo B, Xiong Z, Niyato D, et al. Multi-path transmission of real-time remote sensing data via heterogeneous LEO inter-satellite-links[C]//2024 IEEE 21st International Conference on Mobile Ad-Hoc and Smart Systems (MASS). Hangzhou: IEEE, 2024: 75-8
[16]李恒伟, 罗启章, 顾轶, 范才智, 伍国华. 基于滚动时域策略的中继卫星多目标动态调度优化方法[J]. 航空学报, 2024, 45(16): 329706.
Hengwei LI, Qizhang LUO, Yi GU, Caizhi FAN, Guohua WU. Multi?objective dynamic scheduling optimization method for relay satellites based on rolling horizon strategy[J]. Acta Aeronautica et Astronautica Sinica, 2024, 45(16): 329706 (in Chinese).
[17]蔡伟伟, 伍国华, 李恒伟, 尹谦. 考虑用户偏好的中继卫星多目标调度优化方法[J]. 航空学报, 2025, 46(8): 331074.
[18]Liu R, Sheng M, Xu C, et al. Antenna slewing time aware mission scheduling in space networks[J]. IEEE Communications Letters, 2016, 21(3): 516-519.
[19]Liu C, Wen F, Fan F. Pointing, acquisition, and tracking (PAT) technology for inter-satellite laser links[C]//AOPC 2024: Laser Technology and Applications. Beijing: SPIE, 2024, 13492: 69-77.
[20]Ferrari B, Cordeau J-F, Delorme M, Iori M, Orosei R. Satellite Scheduling Problems: A survey of applications in Earth and outer space observation[J]. Computers & Operations Research, 2025, 173: 106875.
[21]Yin J, Chen Y, Lin X, Zhao Q. The Remote Sensing Data Transmission Problem in Communication Constellations: Shop Scheduling-Based Model and Algorithm[J]. Technologies, 2025, 13(9): 384.