[1] Sherbrooke C C. Metric: a multi-echelon technique for recoverable item control[J]. Operations Research, 1968, 16(1): 122-141.
[2] Muckstadt J A. A model for a multi-item, multi-echelon, multi-indenture inventory system[J]. Management Science, 1973, 20(4): 122-141.
[3] Slay F M. VARI-METRIC: an approach to modeling multi-echelon resupply when the demand process is Poisson with a gamma prior, Report AF301-3[R]. Washington, D.C.: Logistics Management Institute, 1984.
[4] Sherbrooke C C.VARI-METRIC:improved approximations for multi-indenture, multi-echelon availability models[J].Operations Research, 1986, 34(2): 311-319.
[5] Sherbrooke C C. Optimal inventory modeling of system: multi-echelon techniques[M]. 2nd ed. Boston: Artech House, 2004.
[6] Rustenburg W D, van Houtum G J, Zijm W H M. Spare parts management at complex technology-based organizations: an agenda for research[J]. International Journal of Production Economics, 2001, 71(1-3): 177-193.
[7] Francesco C, Giulio D G, Massimo T. Multi-echelon, multi-indenture spare parts inventory control subject to system availability and budget constraints[J]. Reliability Engineering and System Safety, 2013, 119(11): 95-101.
[8] Kimt J S, Shin K C, Yu H K. Optimal algorithm to determine the spare inventory level for a repairable-item inventory system[J]. Computers Operations Research, 1996, 23(3): 289-297.
[9] Diaz A, Fu M C. Models for multi-echelon repairable item inventory systems with limited repair capacity[J]. European Journal of Operational Research, 1997,97(3):480-492.
[10] Sleptchenko A, van der Heijden M C, van Harten A. Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems[J]. International Journal of Production Economics, 2002, 79(3): 209-230.
[11] Ruan M Z, Li Q M, Huang A L, et al. Inventory control of multi-echelon maintenance supply under finite repair channel constraint[J]. Acta Aeronautica et Astronautica Sinica, 2012, 33(11): 2018-2027 (in Chinese). 阮旻智, 李庆民, 黄傲林, 等. 有限维修渠道约束下多级维修供应系统库存控制[J]. 航空学报, 2012, 33(11): 2018-2027.
[12] van der Heijden M C, van Harten A, Sleptchenko S.Approximations for Markovian multi-class queues with preemptive priorities[J].Operations Research Letters, 2004,32(3): 273-282.
[13] Sleptchenko A, van der Heijden M C, van Harten A. Using repair priorities to reduce stock investment in spare part networks[J]. European Journal of Operational Research, 2005, 163(3): 733-750.
[14] Adan I J B F, Sleptchenko A, van Houtum G J. Reducing cost of spare parts supply system via static priorities[J]. Asia-Pacific Journal of Operational Research, 2009, 26(4): 559-585.
[15] Tiemessen H G H,van Houtum G J. Reducing costs of repair spare parts supply systems via scheduling, BETA Working Paper Series[R]. Enscheda: Eindhoven University of Technology, 2010.
[16] Caggiano K E, Muckstadt J A, Rappold J A. Integrated real-time capacity and inventory allocation for reparable service parts in a two-echelon supply system[J].Manufacturing and Service Operations Management,2006,8(3): 292-319.
[17] Sleptchenko A, Selen J, Adan I, et al. Joint queue length distribution of multi-class, single-sever queues with preemptive priorities, EURANDOM Report 2004-045[R]. Eindhoven: Technische Universiteit Eindhoven, 2004.
[18] Xia G Q, Chen H Z. Operational availability oriented inventory model for repairable spare parts of embarked air-wings[J]. Journal of Harbin Engineering University, 2013, 34(1): 1-6 (in Chinese). 夏国清, 陈红召. 面向使用可用度的舰载机可修备件库存模型[J]. 哈尔滨工程大学学报, 2013, 34(1): 1-6.
[19] Luo Y, Ruan M Z, Yuan Z Y. Modeling and optimization of repairable spare parts under the multi-echelon maintenance supply[J]. Systems Engineering—Theory and Practice, 2013, 33(10): 2623-2630 (in Chinese). 罗祎, 阮旻智, 袁志勇. 多级维修供应下可修复备件库存建模与优化[J]. 系统工程理论与实践, 2013, 33(10): 2623-2630. |