| [1] Gopalan R, Talluri K T. The aircraft maintenance routing problem[J]. Operations Research, 1998, 46(2): 260-271.[2] Talluri K T. The four-day aircraft maintenance routing problem[J]. Transportation Science, 1998, 32(1): 43-53.[3] Clarke L, Johnson E, Nemhauser G, et al. The aircraft rotation problem[J]. Annals of Operations Research, 1997, 69(0): 33-46.[4] Sriram C, Haghani A. An optimization model for aircraft maintenance scheduling and re-assignment[J]. Transportation Research Part A: Policy and Practice, 2003, 37(1): 29-48.[5] 肖东喜, 朱金福. 飞机排班中航班环的动态构建方法[J]. 系统工程, 2007, 25(11): 19-25. Xiao Dongxi, Zhu Jinfu. Flight-loop's dynamic construction method in aircraft scheduling[J]. Systems Engineering, 2007, 25(11): 19-25. (in Chinese)[6] Guay E L, Desaulniers G, Soumis F. Aircraft routing under different business process[J]. Journal of Air Transport Management, 2010, 16(5): 258-263.[7] Grönkvist M. Accelerating column generation for aircraft scheduling using constraint propagation[J]. Computer & Operation Research, 2006, 33(10): 2918-2934.[8] Grönkvist M. The tail assignment problem. Göteborg: Department of Computer Science and Engineering, Chalmers University of Technology and Göteborg University, 2005.[9] Gabteni S, Grönkvist M. Combining column generation and constraint programming to solve the tail assignment problem[J]. Annals of Operations Research, 2009, 171(1): 61-76.[10] Grönkvist M. A constraint programming model for tail assigment//Régin J C, Rueher M, editors. Integration of AI and OR Techniques in Constraint Programming for Combinational Optimization Problems. Berlin: Springer-Verlag, 2004: 142-156.[11] 孙宏. 航空公司飞机排班问题: 模型及算法研究. 成都: 西南交通大学交通运输学院, 2003. Sun Hong. Airline tail number assignment problem: model and algorithm. Chengdu: School of Traffic and Transportation, Southwest Jiaotong University, 2003. (in Chinese)[12] Moudaini W E, Camino F M. A dynamic approach for aircraft assignment and maintenance scheduling by airlines[J]. Journal of Air Transport Management, 2000, 6(4): 233-237.[13] Papakostas N, Papachatzakis P, Xanthakis V, et al. An approach to operational aircraft maintenance planning[J]. Decision Support Systems, 2010, 48(4): 604-612.[14] Sarac A, Batta R, Rump C M. A branch-and-price approach for operational aircraft maintenance routing[J]. European Journal of Operational Research, 2006, 175(3): 1850-1869.[15] Shi N. K constrained shortest path problem[J]. IEEE Transactions on Automation Science and Engineering, 2010, 7(1): 15-23.[16] 郭冬芬, 李铁克. 基于约束满足的车间调度算法综述[J]. 计算机集成制造系统, 2007, 13(1): 117-125. Guo Dongfen, Li Tieke. Constraint-based algorithm for job shop scheduling[J]. Computer Integrated Manufacturing Systems, 2007, 13(1): 117-125. (in Chinese)[17] 孙吉贵, 朱兴军, 张永刚, 等. 最先失败原则的约束传播算法[J]. 小型微型计算机系统, 2008, 29(4): 678-681. Sun Jigui, Zhu Xingjun, Zhang Yonggang, et al. Fail first principle for constraint propagation[J]. Journal of Chinese Computer Systems, 2008, 29(4): 678-681. (in Chinese) |