[1] Shah J,Avittathur B.The retailer multi-item inventory problem with demand cannibalization and substitution.International Journal of Production Economics,2007,106(1): 104-114. [2] Sherbrooke C C.METRIC:a multi-echelon technique for recoverable item control.Operations Research,1968,16(1): 122-141. [3] de Haas H F M,Verrijdt J H C M.Target setting for the departments in an aircraft repairable item system.European Journal of Operational Research,1997,99(3): 596-602. [4] Yoon K B, Sohn S Y.Finding the optimal CSP inventory level for multi-echelon system in Air Force using random effects regression model.European Journal of Operational Research,2007,180(3): 1076-1085. [5] Wang N C,Kang R.Optimization of multi-echelon repairable item inventory systems with fill rate as objective.Acta Aeronautica et Astronautica Sinica,2009,30(6):1043-1047.(in Chinese) 王乃超,康锐.基于备件保障概率的多级库存优化模型.航空学报,2009,30(6): 1043-1047. [6] Lee L H, Chew E P, Teng S Y, et al.Multi-objective simu-lation-based evolutionary algorithm for an aircraft spare parts allocation problem.European Journal of Operational Research, 2008,189(2): 325-341. [7] Sleptchenko A,van der Heijden M C,van Harten A.Effects of finite repair capacity in multi-echelon,multi-indenture service part supply systems.International Journal of Production Economics, 2002, 79(3): 209-230. [8] Rustenburg W D,van Houtum G J,Zijm W H M.Spare parts management at complex technology-based organizations: an agenda for research.International Journal of Production Economics, 2001, 71(1): 177-193. [9] Jung W.Recoverable inventory systems with time-varying demand.Production and Inventory Management Journal,1993, 34 (1): 77-81. [10] Liu Y,Wu C,Li Y,et al.Evaluation model of equipment time-varying availability in two-echelon spare support system.Acta Armanentarii, 2010, 31(2): 253-256.(in Chinese) 刘勇,武昌,李阳,等.两级备件保障系统的装备时变可用度评估模型.兵工学报, 2010, 31(2): 253-256. [11] Lau H C, Song H W, See C T, et al.Evaluation of time-varying availability in multi-echelon spare parts systems with passivation.European Journal of Operational Research, 2006, 170(1): 91-105. [12] Sun J C, Li S J, Lu Y M,et al.Simulation and research on the three-echelon storage model of the valuable spare parts in weapon equipment.Acta Armanentarii,2008,29(7):854-858.(in Chinese) 孙江生,李苏剑,吕艳梅,等.武器贵重备件三级库存模型仿真研究.兵工学报, 2008, 29(7): 854-858. [13] Fisher W W,Brennan J J.Performance of cannibalization policies in a maintenance system with spares,repair,and resource constraints.Naval Research Logistics Quarterly,1986, 33(1): 1-15. [14] Fisher W W, Brennan J J. Model for cannibalization policy performance comparisons in a complex maintenance system.Proceedings of the Summer Computer Simulation Conference.San Diego,CA,USA:North-Holland, 1985:585-589. [15] Byrkett D L.Units of equipment available using cannibalization for repair-part support.IEEE Transactions on Reliability, 1985, 34(1): 25-28. [16] Salman S,Cassady C R, Pohl E A, et al.Evaluating the impact of cannibalization on fleet performance.Quality and Reliability Engineering International,2007,24(4):445-457. [17] Fisher W W.Markov process modeling of a maintenance system with spares,repair,cannibalization and manpower constraints.Mathematical and Computer Modeling,1990,13(7): 119-125. [18] Li L W, Zhang J J, Zhang T, et al.Mission oriented cannibalization policy problem and its solving algorithm.Systems Engineering Theory & Practice,2009,29(7): 97-104.(in Chinese) 李羚伟,张建军,张涛,等.面向任务的拼修策略问题及其求解算法.系统工程理论与实践, 2009, 29(7): 97-104. [19] Sherbrooke C C.Optimal inventory modeling of system:multi-echelon techniques.2nd ed.Boston:Artech House,2004. [20] Sherbrooke C C.Estimation of the variance-to-mean ratio for AFLC recoverable items.Potomac,MD: Sherbrooke & Associates, 1984. |