ACTA AERONAUTICAET ASTRONAUTICA SINICA >
Optimization model for multi-level and multi-echelon spare part allocation in dynamic support structure
Received date: 2016-09-29
Revised date: 2017-03-03
Online published: 2017-03-03
Supported by
National Defence Pre-research Foundation (51327020105, 51304010206)
In long time and long distance tasks of combat formation, the support site of combat fleet would change. Considering the characteristics of military support, the distribution law of remaining spare parts is calculated based on Multi-Echelon Technique for Recoverable Item Control(METRIC) theory, and the model for spare part support based on time varying availability is established for the dynamic support system. With the storage space of spare parts as the constraint and the degree of availability as the goal, a model for phased marginal optimization is established. An example is presented, and the optimization of spare parts is carried out by using the stage marginal algorithm. The variation of equipment availability with time in the dynamic support structure and the fixed support structure is compared and analyzed, and Monte Carlo simulation method is used to verify the case. The results show that the availability of equipment can be effectively improved by adopting multiple depot security methods. The error between the simulation results and the analytical results is within 4%. The model proposed can provide assistant decision tool for decision makers to make spare part plan.
ZHOU Liang , LI Qingmin , PENG Yingwu , LI Hua . Optimization model for multi-level and multi-echelon spare part allocation in dynamic support structure[J]. ACTA AERONAUTICAET ASTRONAUTICA SINICA, 2017 , 38(11) : 220822 -220822 . DOI: 10.7527/S1000-6893.2017.320822
[1] ISAACSON K E, BOREN P. Dyna-METRIC Version 6:An advanced capability assessment model:R-4214-AF[R]. Santa Monica, CA:RAND Corporation, 1993.
[2] LAU H C, SONG H, SEE T C, et al. Evaluation of time-varying availability in multi-echelon spare parts systems with passivation[J].European Journal of Operational Research, 2006, 170(1):91-105.
[3] 王睿,雷红伟,彭英武,等. 战时任务条件下舰艇装备多级备件优化[J].上海交通大学学报, 2013,47(3):398-403. WANG R, LEI H W, PENG Y W, et al. Optimal of warship spare parts in the scenario of wartime mission[J]. Journal of Shanghai Jiaotong University, 2013, 47(3):398-403(in Chinese).
[4] 周亮,李庆民,王睿,等. K/N(G)冗余结构下随舰备件配置方案[J].系统工程与电子技术,2015,37(12):2785-2790. ZHOU L, LI Q M, WANG R, et al. Spare parts allocation scheme with ship for K/N(G) redundant structure[J]. Systems Engineering and Electronics,2015,37(12):2785-2790(in Chinese).
[5] 徐立,李庆民,李华,等.有限维修能力下作战单元时变可用度评估模型[J].国防科技大学学报,2016, 38(1):114-121. XU L, LI Q M, LI H, et al. Evaluation model of time-varying availability for combat units under finite repair capacity[J].Journal of National University of Defense Technology,2016,38(1):114-121(in Chinese).
[6] 李华,李庆民,刘任洋.任务期内多层级不完全修复件的可用度评估[J].系统工程与电子技术, 2016,38(2):476-481. LI H,LI Q M,LIU R Y. Evualtion of availability for multi-indenture partial repairable spares during the mission[J].Systems Engineering and Electronics,2016,38(2):476-481(in Chinese).
[7] 刘勇,武昌,李阳,等.两级备件保障系统的装备时变可用度评估模型[J].兵工学报,2010,31(2):253-256. LIU Y,WU C,LI Y, et al. Evaulation model of equipment time varying availability in two echelon spare support system[J]. Acta Armamentarii,2010,31(2):253-256(in Chinese).
[8] 周亮,彭英武,李庆民,等.串件拼修策略下不完全修复件可用度评估建模[J].系统工程与电子技术,2017,39(5):1065-1071. ZHOU L, PENG Y W, LI Q M,et al. Time-varying availability evaluation modeling of incomplete repair parts under cannibalization[J].Systems Engineering and Electroics, 2017,39(5):1065-1071(in Chineses).
[9] 周亮,李庆民,彭英武,等. 串件拼修对策下K/N(G)结构系统可用度评估建模[J].航空学报, 2017, 38(4):220319. ZHOU L, LI Q M, PENG Y W, et al. Availability evaluation modeling for K/N(G) structure system with cannibalization[J]. Acta Aeronautica et Astronautica Sinica, 2017, 38(4):220319(in Chinese).
[10] KLINGER K M. The application of a readiness-based sparing model to foreign military sales:AD-A280629[R].1994.
[11] 王慎,李庆民,彭英武. 串件拼修对策下两级备件维修供应系统动态管理模型[J]. 航空学报,2013,34(6):1326-1335. WANG S,LI Q M,PENG Y W. Dynamic management model of two-echelon maintence supply system for spare parts with cannibalization[J]. Acta Aeronautica et Astronautica Sinica, 2013, 34(6):1326-1335(in Chinese).
[12] BÜYÜKKURT M D, PARLAR M. A comparison of allocation policies in a two-echelon repairable-item inventory model[J]. International Journal of Production Economics, 1993, 29(3):291-302.
[13] SHERBROOKE C C. Optimal inventory modeling of systems:Multi-echelon techniques[M]. 2nd ed. Norwell,MA:Kluwer Academic Publishers, 2004.
[14] ZHOU L, LI Q M, LIU R Y. Optimal inventory control of spare parts based on storage availability[C]//28th Chinese Control and Decision Conference, 2016:6409-6414.
[15] 任敏,陈全庆,沈震.备件供应学[M].北京:国防工业出版社, 2013:278-289. REN M, CHEN Q Q, SHEN Z. Spare parts supply[M]. Beijing:National Defence Industry Press, 2013:278-289(in Chinese).
[16] TYSSELAND B E. Spare parts optimization process and results:OPUS10 cases in the Norwegian Defence[J]. International Journal of Physical Distribution & Logistics Management, 2009, 39(1):8-27.
/
〈 | 〉 |