Electronics and Electrical Engineering and Control

Proactive robust scheduling of aircraft carrier flight deck operations with uncertain activity durations

  • WAN Bing ,
  • SU Xichao ,
  • GUO Fang ,
  • HAN Wei ,
  • LIANG Yong
Expand
  • Naval Aviation University, Yantai 264001, China

Received date: 2021-06-17

  Revised date: 2021-08-07

  Online published: 2021-09-08

Supported by

Naval Equipment Pre-research Project

Abstract

In view of the complex procedures, resource constraints, and uncertain activity durations of carrier-based aircraft deck operations, this paper proposes a proactive robust scheduling method of deck operations with uncertain durations to improve the robustness of fleet operation scheduling under cycle time constraints. First, the aircraft fleet operation is abstracted as a resource-constrained multi-project scheduling problem with uncertain durations, and a mixed-integer programming model is constructed after considering the constraints of time, space, and cross-coupling between multi-aircraft operation. Then, considering the characteristics of probability distribution of uncertain durations, a robust objective function based on comprehensive indicators such as the on-time completion probability, maximum completion expectation and variance of the fleet deck operation is proposed, and a proactive robust scheduling model for the centralized support is established. The three-stage robust scheduling generation mechanism and pre-constraint strategy (CPC) are given, and an I-Memetic optimization algorithm combining dual-population Genetic operator and adaptive variable neighborhood local operator is designed. Finally, Monte Carlo simulation is used to verify the robust deck operation benchmark scheduling. Experiments show that proactive robust scheduling can better suppress the disturbance of uncertain activity durations during the deck operation cycle, and ensure the smooth operation with robust scheduling scheme. In the deterministic and robust scheduling simulation, the algorithm proposed is significantly better than other related intelligent optimization algorithms, and the CPC strategy is the best one among the robust scheduling strategies.

Cite this article

WAN Bing , SU Xichao , GUO Fang , HAN Wei , LIANG Yong . Proactive robust scheduling of aircraft carrier flight deck operations with uncertain activity durations[J]. ACTA AERONAUTICAET ASTRONAUTICA SINICA, 2022 , 43(12) : 325971 -325971 . DOI: 10.7527/S1000-6893.2021.25971

References

[1] 王能建, 刘钦辉, 李江. 舰载机出动回收能力仿真研究[M]. 北京:科学出版社, 2018. WANG N J, LIU Q H, LI J. Simulation research on dispatch recovery capability of carrier-based aircraft[M]. Beijing:Science Press, 2018(in Chinese).
[2] RYAN J C. Evaluating safety protocols for manned unmanned environments through agent based simulation[D]. Cambridge:Massachusetts Institute of Technology, 2014.
[3] RYAN J C, BANERJEE A G, CUMMINGS M L, et al. Comparing the performance of expert user heuristics and an integer linear program in aircraft carrier deck operations[J]. IEEE Transactions on Cybernetics, 2014, 44(6):761-773.
[4] MICHINI B, HOW J. A human-interactive course of action planner for aircraft carrier deck operations:AIAA-2011-1515[R]. Reston:AIAA, 2011.
[5] ZHENG M, YANG F Q, DONG Z P, et al. Carrier-borne aircrafts aviation operation automated scheduling using multiplicative weights apprenticeship learning[J]. International Journal of Advanced Robotic Systems, 2019, 16(1):172988141982891.
[6] MURAVEV D, HU H, RAKHMANGULOV A, et al. Multi-agent optimization of the intermodal terminal main parameters by using AnyLogic simulation platform:Case study on the Ningbo-Zhoushan Port[J]. International Journal of Information Management, 2021, 57:102133.
[7] WU Y, QU X J. Obstacle avoidance and path planning for carrier aircraft launching[J]. Chinese Journal of Aeronautics, 2015, 28(3):695-703.
[8] ZHANG Z, LIN S L, DONG R, et al. Designing a human-computer cooperation decision planning system for aircraft carrier deck scheduling:AIAA-2015-1111[R]. Reston:AIAA, 2015.
[9] YU L F, ZHU C, SHI J M, et al. An extended flexible job shop scheduling model for flight deck scheduling with priority, parallel operations, and sequence flexibility[J]. Scientific Programming, 2017, 2017:2463252.
[10] WANG X W, LIU J, SU X C, et al. A review on carrier aircraft dispatch path planning and control on deck[J]. Chinese Journal of Aeronautics, 2020, 33(12):3039-3057.
[11] QI C, WANG D. Dynamic aircraft carrier flight deck task planning based on HTN[J]. IFAC-PapersOnLine, 2016, 49(12):1608-1613.
[12] CUI R W, HAN W, SU X C, et al. A dual population multi-operator genetic algorithm for flight deck operations scheduling problem[J]. Journal of Systems Engineering and Electronics, 2021, 32(2):331-346.
[13] 苏析超, 韩维, 萧卫, 等. 基于Memetic算法的舰载机舰面一站式保障调度[J]. 系统工程与电子技术, 2016, 38(10):2303-2309. SU X C, HAN W, XIAO W, et al. Pit-stop support scheduling on deck of carrier plane based on Memetic algorithm[J]. Systems Engineering and Electronics, 2016, 38(10):2303-2309(in Chinese).
[14] 刘钦辉, 邱长华, 王能建. 考虑空间约束的舰载机作业调度模型研究[J]. 哈尔滨工程大学学报, 2012, 33(11):1435-1439, 1452. LIU Q H, QIU C H, WANG N J. Study on ship-based aircraft operation scheduling model considering spatial restriction[J]. Journal of Harbin Engineering University, 2012, 33(11):1435-1439, 1452(in Chinese).
[15] YUAN P L, HAN W, SU X C, et al. A dynamic scheduling method for carrier aircraft support operation under uncertain conditions based on rolling horizon strategy[J]. Applied Sciences, 2018, 8(9):1546.
[16] SU X C, HAN W, WU Y, et al. A robust scheduling optimization method for flight deck operations of aircraft carrier with ternary interval durations[J]. IEEE Access, 6:69918-69936.
[17] 李亚飞, 吴庆顺, 徐明亮, 等. 基于强化学习的舰载机保障作业实时调度方法[J]. 中国科学:信息科学, 2021, 51(2):247-262. LI Y F, WU Q S, XU M L, et al. Real-time scheduling for carrier-borne aircraft support operations:A reinforcement learning approach[J]. Scientia Sinica (Informationis), 2021, 51(2):247-262(in Chinese).
[18] BALOUKA N, COHEN I. A robust optimization approach for the multi-mode resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2021, 291(2):457-470.
[19] HAUDER V A, BEHAM A, RAGGL S, et al. Resource-constrained multi-project scheduling with activity and time flexibility[J]. Computers & Industrial Engineering, 2020, 150:106857.
[20] VAN DE VONDER S, DEMEULEMEESTER E, HERROELEN W. Proactive heuristic procedures for robust project scheduling:An experimental analysis[J]. European Journal of Operational Research, 2008, 189(3):723-733.
[21] BOLD M, GOERIGK M. A compact reformulation of the two-stage robust resource-constrained project scheduling problem[J]. Computers & Operations Research, 2021, 130:105232.
[22] ZENG B, ZHAO L. Solving two-stage robust optimization problems using a column-and-constraint generation method[J]. Operations Research Letters, 2013, 41(5):457-461.
[23] 苏析超, 韩维, 张勇, 等. 考虑人机匹配模式的舰载机甲板机务勤务保障调度算法[J]. 航空学报, 2018, 39(12):222314. SU X C, HAN W, ZHANG Y, et al. Scheduling algorithm for maintenance and service support of carrier-based aircraft on flight deck with different man-aircraft matching patterns[J]. Acta Aeronautica et Astronautica Sinica, 2018, 39(12):222314(in Chinese).
[24] BRUNI M E, BERALDI P, GUERRIERO F, et al. A heuristic approach for resource constrained project scheduling with uncertain activity durations[J]. Computers & Operations Research, 2011, 38(9):1305-1318.
[25] GEIGER M J. A multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problem[J]. European Journal of Operational Research, 2017, 256(3):729-741.
[26] 蒋婷婷, 韩维, 苏析超. 基于改进DE算法的舰载机保障调度优化[J]. 计算机仿真, 2018, 35(10):51-56. JIANG T T, HAN W, SU X C. Optimization of carrier aircraft support scheduling based on improved DE algorithm[J]. Computer Simulation, 2018, 35(10):51-56(in Chinese).
[27] ZHOU Y Z. A modified differential evolution algorithm for resource constrained multi-project scheduling problem[J]. Journal of Computers, 2014, 9(8):1922-1927.
[28] 李敬花, 胡载萍, 吕慧超, 等. 多资源约束下海工装备多项目调度优化[J]. 哈尔滨工程大学学报, 2013, 34(10):1214-1220. LI J H, HU Z P, LYU H C, et al. Optimization of multi-resource constrained offshore equipment multi-project scheduling[J]. Journal of Harbin Engineering University, 2013, 34(10):1214-1220(in Chinese).
[29] BALLESTÍN F. When it is worthwhile to work with the stochastic RCPSP?[J]. Journal of Scheduling, 2007, 10(3):153-166.
[30] 郑晓龙, 王凌. 随机资源约束项目调度问题基于序的果蝇算法[J]. 控制理论与应用, 2015, 32(4):540-545. ZHENG X L, WANG L. An order-based fruit fly optimization algorithm for stochastic resource-constrained project scheduling[J]. Control Theory & Applications, 2015, 32(4):540-545(in Chinese).
Outlines

/